Skip to content

Home

The Home screen summarizes all your thermal inspection projects: global indicators, an anomaly chart, the location map and the projects table.

Which projects appear

Home shows projects of type Thermal and Thermal + Scanning. To see all your projects, of any type, use All Projects.


Indicators (KPI)

Card Main value Detail
Projects Number of projects ❤️ badge with the number of favorites. Last Inspected on: date of the most recent project
Inspections Projects with a report available IEC compliance reports available
Anomalies Total anomalies detected across your projects —
Peak Power (MWp) Combined installed peak power CO₂ avoided per year (tons)

How they are calculated:

  • Peak Power = sum of units × power of the modules in each project, in MWp.
  • CO₂/year = MWp × 1.4 × 0.357 × 1000 (tons; estimate based on annual production and the emission factor).
  • A project is considered inspected (Completed) when its full report is available.

Anomaly chart

Control Description
Project selector All Projects (Summary) or a specific project. By default, the most recent one
Bar / Radar Chart type (Radar only on large screens)
  • With a project: number of anomalies per class.
  • With All Projects (Summary): the 5 most frequent classes across all your projects.

Colors by class: Cell and Multi-Cell in red, Diode green, String blue, Module yellow, Soiling purple, Polarity orange and the rest gray. If there are no anomalies you'll see All Clear!.

Location map

Project Location shows the selected plant (red marker, address and coordinates) or all your plants (blue markers) in summary mode. With a project selected, clicking the map opens its full Map. The marker shows the number of anomalies.


Projects table

Element Description
All Projects All the projects on Home
Favorites Your favorites
Completed Projects with a report available
Search Filters by name, ID or address. Esc closes the search
Funnel (Filter by Type) Shows only certain types: Thermal, Thermal + Scanning
Columns (Customize Columns) Shows or hides columns (resets on reload)

Columns

Column Description
Checkbox Row selection
Project Name Opens the Project Dashboard
Type Thermal or Thermal + Scanning (thermography plus module serial number scanning)
Date Inspection date
Status Completed (report available) or In Process
Access Users with access to the project (see below)
Anomalies Number of anomalies in the project
Weather Forecast and saved weather data (see below)
⋮ Row menu

Row menu (⋮):

Option Description
Project Dashboard Opens the project's dashboard
Map view Opens the project's map
Scan View Opens the scanner (Thermal + Scanning projects only)
See Full Report Opens the full report in another tab (if it exists)

Pagination allows 10, 20, 30, 40 or 50 rows per page.

In Process projects

While a project is In Process the number of anomalies may not be final.

User access

The Access column shows the initials of the users with access; click to see the full list.

With user management permission, the Add users button also appears: search for a user in your organization and click on them to grant or remove their access to the project (a green check indicates they already have access).

Weather

The thermometer button opens the Weather dialog:

  • Forecast: forecast for the next 10 days for the plant's location (cloud cover in oktas, temperature, wind, humidity, radiation and chance of rain). The BEST badge marks the day with the highest radiation and TODAY marks the current day. On large screens, hourly detail is shown with IEC reference lines (radiation 300/600 W/m², wind 28 km/h, cloud cover 2 oktas).
  • Saved Weather: weather data saved for the flight days.
  • Save as Flight Meteo (requires editing permission): saves the forecast for the selected day as the flight's weather data.

Planning the flight

IEC TS 62446-3 recommends inspecting with sufficient irradiance (≥ 600 W/m²), low wind and clear sky. Use the chart's IEC lines to choose the time slot.


If you don't have any projects yet

Home will show Project list is empty. Contact STR's sales team or wait for an administrator to assign you your first project.